59 tasks

Build a durable, self-scaling company that wins its market — you achieve Start A Company by design, not by luck.

Start this plan

Sign in to review and change this plan before creating a private project.

Derived from guideStart A Company
Source details

Derivation tier: T1

start-a-company · 283709dcf4e3c6426408f5c9fb0120b30b679ad4b56defaf155f5844244cbd3d

Authorship and review status are not recorded here.

Template tasks (59)

Review tasks and choose or change owners before creating your project. Assigning an agent does not start it.

Tasks begin as To Do in your project.

  • #1Customer Discovery / Getting Out of the BuildingHigh

    Replace your assumptions about who wants your product and why with firsthand evidence gathered from the people who would actually buy it.

    Completion check

    The customer discovery / getting out of the building work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 0 days after project start · Planned duration: 14 days

  • #2Founding Team Quality & CohesionHigh

    What makes a founding team more than the sum of its résumés: complementarity across the Hacker (makes the product), Hustler (runs the business), and Hipster (owns customer experience) roles, coachability, shared vision, and the ability to fight productively. You stress-test alignment on vision, roles, commitment, and failure scenarios before the first conflict—and learn why team composition is the most underrated startup variable.

    Completion check

    The founding team quality & cohesion work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 14 days after project start · Planned duration: 14 days

  • #3Founder Psychology, Passion & ResilienceHigh

    Builds the inner operating system that lets you persist through the crises that define startup life: reframing setbacks as data rather than verdicts, converting psychological pressure into action bias, and anchoring persistence to a fixed compass value rather than fear. Resilience here means sustained decision quality under pressure—not refusal to ever stop—and is treated as a trainable discipline, not a personality trait.

    Completion check

    The founder psychology, passion & resilience work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 28 days after project start · Planned duration: 7 days

  • #4Customer-Centric MindsetMedium

    Builds the behavioral discipline of consistently placing customer observations above founder assumptions. You learn to substitute watching and measuring for asking and imagining, so product decisions are grounded in what customers actually do—not what they say they want. The mindset is treated as an organizational output to deliberately manufacture, not a natural attitude.

    Completion check

    The customer-centric mindset work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 35 days after project start · Planned duration: 7 days

  • #5Structured Solution Ideation & PrototypingMedium

    Apply a repeatable method for generating and stress-testing product ideas before committing engineering time—running structured brainstorms with the right constraints and improv rules, producing lo-fi prototypes quickly, and translating the most promising signals into a defined problem-solution hypothesis you can test with real customers.

    Completion check

    The structured solution ideation & prototyping work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 42 days after project start · Planned duration: 7 days

  • #6Vision Clarity & Strategic ObjectiveMedium

    Focus on about defining a written, shared vision and strategic objective specific enough that people can make aligned decisions without asking you.

    Completion check

    The vision clarity & strategic objective work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 49 days after project start · Planned duration: 7 days

  • #7Market Focus / Beachhead SelectionHigh

    Pick a single narrow segment to dominate first, and why deliberately turning away other customers accelerates you.

    Completion check

    The market focus / beachhead selection work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 56 days after project start · Planned duration: 14 days

  • #8Minimum Viable ProductHigh

    Scope the smallest product that generates real customer learning and how to decide, from feedback, whether to iterate or pivot.

    Completion check

    The minimum viable product work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 70 days after project start · Planned duration: 14 days

  • #9Quantified Value Proposition / Compelling OfferHigh

    Express your value in numbers tied to the customer's top priority, against the alternatives they'd otherwise choose.

    Completion check

    The quantified value proposition / compelling offer work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 84 days after project start · Planned duration: 14 days

  • #10Competitive Positioning & DefensibilityHigh

    Position your product as the obvious best choice against every alternative—including the customer doing nothing.

    Completion check

    The competitive positioning & defensibility work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 98 days after project start · Planned duration: 14 days

  • #11Market Size & AttractivenessHigh

    Assess whether the market you're entering is large and growing enough to build a real company—and how that assessment shapes investor and strategic decisions.

    Completion check

    The market size & attractiveness work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 112 days after project start · Planned duration: 14 days

  • #12Market Type & Competitive ContextHigh

    Use the four market-entry types—existing, re-segmented, new, and clone—and shows how each dictates a fundamentally different spending, timing, and revenue playbook for your company.

    Completion check

    The market type & competitive context work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 126 days after project start · Planned duration: 14 days

  • #13Pricing & Business Model FitHigh

    How you'll capture value—the model category and the pricing—so that what you charge tracks the benefit you deliver and what customers will pay.

    Completion check

    The pricing & business model fit work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 140 days after project start · Planned duration: 14 days

  • #14Validated LearningHigh

    Use the discipline to turn your riskiest beliefs into experiments with pass/fail thresholds set in advance, so you learn instead of merely confirming what you hoped.

    Completion check

    The validated learning work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 154 days after project start · Planned duration: 14 days

  • #15Hypothesis-Driven Experimentation & IterationHigh

    Convert vague founder intuitions into pass/fail experiments and how to decide when results mean iterate versus pivot.

    Completion check

    The hypothesis-driven experimentation & iteration work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 168 days after project start · Planned duration: 14 days

  • #16Metric Focus & Data InstrumentationMedium

    Instrument your product and choose the few metrics that matter at your current stage, so decisions rest on evidence instead of the loudest opinion in the room. You'll learn to set targets before you look at data.

    Completion check

    The metric focus & data instrumentation work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 182 days after project start · Planned duration: 7 days

  • #17Action Orientation / Bias to ShipHigh

    Clarifies when velocity is your decisive weapon and how to move fast without confusing motion for progress.

    Completion check

    The action orientation / bias to ship work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 189 days after project start · Planned duration: 14 days

  • #18Product/Market FitHigh

    Recognize product/market fit by its unmistakable symptoms and warns you against declaring it prematurely.

    Completion check

    The product/market fit work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 203 days after project start · Planned duration: 14 days

  • #19Customer Retention, Engagement & Habit FormationHigh

    Measure and defend the ongoing use that keeps customers from leaking away after you win them. You'll learn to distinguish retention curves that flatten from those that decay to zero.

    Completion check

    The customer retention, engagement & habit formation work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 217 days after project start · Planned duration: 14 days

  • #20Whole Product & Partner EcosystemHigh

    What a pragmatist buyer actually needs beyond your core product — the integrations, services, and partners that make your solution usable for their full objective.

    Completion check

    The whole product & partner ecosystem work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 231 days after project start · Planned duration: 14 days

  • #21Customer Acquisition & Distribution ChannelsHigh

    Find the one or two channels that reliably and affordably bring in customers at scale, rather than dabbling in all of them at once.

    Completion check

    The customer acquisition & distribution channels work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 245 days after project start · Planned duration: 14 days

  • #22Customer Traction & AcquisitionHigh

    Define what real traction looks like—paying, retained, growing demand—and separates it from the vanity signals that fool founders and investors alike.

    Completion check

    The customer traction & acquisition work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 259 days after project start · Planned duration: 14 days

  • #23Unit Economics (LTV / CAC)High

    Teaches you to compute LTV and CAC honestly and read their ratio as a verdict on whether growth makes you richer or poorer. You'll learn which costs and revenues actually belong in each number.

    Completion check

    The unit economics (ltv / cac) work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 273 days after project start · Planned duration: 14 days

  • #24Investor Readiness & Fundraising FitLow

    The state of preparedness — data room, milestones, corporate housekeeping, funding plan — plus targeting investors who actually fit your stage and sector.

    Completion check

    The investor readiness & fundraising fit work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 287 days after project start · Planned duration: 3 days

  • #25Target Persona & Customer SpecificityMedium

    Compress a fuzzy 'target market' into one concrete person whose priorities and buying process your whole team can name.

    Completion check

    The target persona & customer specificity work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 290 days after project start · Planned duration: 7 days

  • #26Activation / Aha MomentMedium

    The two distinct events you must engineer: the first 'aha' moment where value lands, and the reinforcement loop that turns one visit into a routine. You'll learn to define both in measurable terms specific to your product.

    Completion check

    The activation / aha moment work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 297 days after project start · Planned duration: 7 days

  • #27Word-of-Mouth & ViralityMedium

    Distinguishes true referral-driven growth from paid acquisition dressed up as organic, and shows how to engineer shareability into the product.

    Completion check

    The word-of-mouth & virality work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 304 days after project start · Planned duration: 7 days

  • #28Audience Building via Content & PlatformHigh

    Building a direct, recurring relationship with an audience you own — followers who return for your content and can be monetized without renting access from a platform algorithm.

    Completion check

    The audience building via content & platform work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 311 days after project start · Planned duration: 14 days

  • #29Rigorous Hiring & Talent AcquisitionMedium

    Compete for high-caliber people when you can't match salaries, and how to keep them through vesting horizons and the inevitable rough stretches.

    Completion check

    The rigorous hiring & talent acquisition work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 325 days after project start · Planned duration: 7 days

  • #30Scaling Techniques & Management AdaptationHigh

    Use the map for how your leadership job changes as headcount and complexity multiply, and which systems must replace your personal involvement at each threshold.

    Completion check

    The scaling techniques & management adaptation work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 332 days after project start · Planned duration: 14 days

  • #31Lean Operation & BootstrappingMedium

    The choice between bootstrapping for control and focus versus raising to fund growth ahead of revenue — and how that choice moderates what kind of growth is even possible.

    Completion check

    The lean operation & bootstrapping work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 346 days after project start · Planned duration: 7 days

  • #32Capital Availability & Funding RaisedMedium

    Focus on about actually closing a round at acceptable terms — and connecting that close to the exit proceeds and returns stakeholders eventually realize.

    Completion check

    The capital availability & funding raised work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 353 days after project start · Planned duration: 7 days

  • #33Investor Perceived Risk, Trust & ValueMedium

    Address the subjective judgment investors form about failure risk and founder credibility — the real currency behind funding decisions and terms.

    Completion check

    The investor perceived risk, trust & value work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 360 days after project start · Planned duration: 7 days

  • #34Startup ValuationMedium

    Use the deal literacy to derive a defensible valuation and to negotiate the terms — liquidation preferences, anti-dilution, control — that matter more than the headline number.

    Completion check

    The startup valuation work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 367 days after project start · Planned duration: 7 days

  • #35Equity Structure & Cap TableMedium

    How founder splits, option pools, share classes, and vesting mechanics govern who owns what across funding rounds.

    Completion check

    The equity structure & cap table work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 374 days after project start · Planned duration: 7 days

  • #36Profitability & Financial DisciplineMedium

    Address turning use into money and money into margin—the recurring income and cost structure that let the venture fund itself. You'll learn when top-line growth is real and when it's disguised subsidy.

    Completion check

    The profitability & financial discipline work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 381 days after project start · Planned duration: 7 days

  • #37Customer Trust & CredibilityMedium

    Build the perception that your product and company are safe, proven, and supportable enough to bet on.

    Completion check

    The customer trust & credibility work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 388 days after project start · Planned duration: 7 days

  • #38Customer Adoption & Willingness to PayMedium

    Define the behavioral evidence—use, payment, and advocacy—that proves customers actually value your product, not just say they do.

    Completion check

    The customer adoption & willingness to pay work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 395 days after project start · Planned duration: 7 days

  • #39Repeatable & Scalable Business ModelMedium

    What it means to have a business model where sales are predictable and repeatable and where more spend reliably yields more revenue.

    Completion check

    The repeatable & scalable business model work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 402 days after project start · Planned duration: 7 days

  • #40Exit & Stakeholder ReturnsMedium

    How liquidity events actually distribute money among founders, employees, and investors, and how earlier structural choices govern who gets what.

    Completion check

    The exit & stakeholder returns work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 409 days after project start · Planned duration: 7 days

  • #41Founder Freedom & FulfillmentMedium

    Address the autonomy and quality of life the business is supposed to produce for you, and why it does not arrive automatically with success.

    Completion check

    The founder freedom & fulfillment work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 416 days after project start · Planned duration: 7 days

  • #42Disruptive Innovation & Incumbent DynamicsHigh

    Structure and fund a genuinely disruptive line so it isn't strangled by the pull of your existing business and customers.

    Completion check

    The disruptive innovation & incumbent dynamics work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 423 days after project start · Planned duration: 14 days

  • #43Process Documentation & SystematizationMedium

    Build the company as a replicable system — documented, simplified, consistently-run core processes — so results don't depend on any one person's memory.

    Completion check

    The process documentation & systematization work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 437 days after project start · Planned duration: 7 days

  • #44Chasm Crossing / Mainstream EntryHigh

    Address the hardest transition in a young company's life: moving from early enthusiast customers to a self-sustaining mainstream segment.

    Completion check

    The chasm crossing / mainstream entry work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 444 days after project start · Planned duration: 14 days

  • #45Sustainable, Scalable GrowthHigh

    Define what makes growth repeatable and compounding rather than a one-time spike, and how to identify your working engine of growth. You'll learn to tell a scalable channel from a temporarily lucky one.

    Completion check

    The sustainable, scalable growth work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 458 days after project start · Planned duration: 14 days

  • #46Company Survival & SuccessHigh

    The ultimate outcome—a company that survives existential threats and wins its market—and the factors that moderate whether you reach it. You'll learn what actually kills companies versus what founders fear kills them.

    Completion check

    The company survival & success work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 472 days after project start · Planned duration: 14 days

  • #47Organizational Culture, Trust & AlignmentHigh

    Build the interpersonal foundation — trust, safety, and transmitted culture — that lets a founding team argue productively and stay intact as headcount grows. You get the mechanics of how founders manufacture candor rather than wait for it.

    Completion check

    The organizational culture, trust & alignment work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 486 days after project start · Planned duration: 14 days

  • #48Accountability & Execution DisciplineHigh

    Turning a shared vision into an accountable operating state — clear roles, owned numbers, open communication, and people held to results.

    Completion check

    The accountability & execution discipline work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 500 days after project start · Planned duration: 14 days

  • #49Engagement Mechanics (Triggers, Rewards, Investment)Low

    Breaks down the trigger–action–reward–investment loop and how to engineer it so use becomes habitual rather than effortful.

    Completion check

    The engagement mechanics (triggers, rewards, investment) work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 514 days after project start · Planned duration: 3 days

  • #50Data / Evidence-Based Decision CultureLow

    Install a weekly rhythm of tracking activity-based numbers, with a number assigned to every person, to keep an objective pulse on the business.

    Completion check

    The data / evidence-based decision culture work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 517 days after project start · Planned duration: 3 days

  • #51Team Development & Feedback SystemsLow

    Build the structures, norms, and review rhythms that grow both skill and commitment after you've hired well.

    Completion check

    The team development & feedback systems work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 520 days after project start · Planned duration: 3 days

  • #52Leadership Transparency & CommunicationLow

    Communicate the company's real state—including bad news—and how to handle sensitive decisions in ways that compound trust.

    Completion check

    The leadership transparency & communication work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 523 days after project start · Planned duration: 3 days

  • #53Term Sheet & Deal TermsLow

    Builds the deal literacy to read a term sheet for what it actually does—especially the control and downside-protection clauses that outweigh the valuation.

    Completion check

    The term sheet & deal terms work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 526 days after project start · Planned duration: 3 days

  • #54Equity Incentive Alignment & RetentionLow

    Structure options, pools, and vesting so equity actually recruits and holds people instead of quietly triggering tax bombs or resentment.

    Completion check

    The equity incentive alignment & retention work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 529 days after project start · Planned duration: 3 days

  • #55Cash Allocation System (Profit First)Low

    The Profit First method of partitioning revenue into designated accounts on a fixed rhythm so profitability is enforced by structure rather than willpower.

    Completion check

    The cash allocation system (profit first) work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 532 days after project start · Planned duration: 3 days

  • #56Core DefensibilityMedium

    Address what makes your competitive advantage self-reinforcing over time rather than merely temporary—the network effects, switching costs, proprietary data, and ecosystem lock-in that make your market position harder to attack the longer you hold it. You learn to distinguish a durable moat from a head start, and how to deliberately deepen defensibility as the company scales.

    Completion check

    The core defensibility work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 535 days after project start · Planned duration: 7 days

  • #57Capital Allocation & Per-Share ValueMedium

    The discipline of ranking every investment alternative by its risk-adjusted return and directing capital toward uses that grow value per share—not top-line revenue or headcount—so the company compounds owner value rather than diluting it. You learn when reinvestment beats distributions and how to read the allocation decisions that separate durable great companies from temporarily successful ones.

    Completion check

    The capital allocation & per-share value work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 542 days after project start · Planned duration: 7 days

  • #58Issue Solving DisciplineMedium

    Use the structured practice of surfacing issues openly, identifying root causes rather than symptoms, and assigning clear accountability for resolution—so problems do not recur and your leadership team builds a track record of closing the loop. You learn the weekly rhythm that keeps issues from aging and the facilitation moves that prevent meetings from ending on the problem instead of the fix.

    Completion check

    The issue solving discipline work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 549 days after project start · Planned duration: 7 days

  • #59Employee Motivation & EngagementMedium

    Build the systems, rhythms, and individual attention that sustain motivation and discretionary effort from employees after the initial hire—covering goal alignment, recognition, autonomy, and the feedback loops that keep people growing rather than disengaging as the company scales beyond the founding team.

    Completion check

    The employee motivation & engagement work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 556 days after project start · Planned duration: 7 days

Start this plan

Sign in to review and change this plan before creating a private project.

Template usage
  • Recorded uses: 0
  • Projects marked complete: 0 (self-declared)
  • Independent completion results are not available.