Run Operations And Supply Chains On Evidence

54 tasks

The ultimate financial performance of the firm — profit, margin, ROI/ROA, cash flow, shareholder value, and market capitalization. (Institutionalize evidence into durable advantage.)

Start this plan

Sign in to review and change this plan before creating a private project.

Derived from guideRun Operations And Supply Chains On Evidence
Source details

Derivation tier: T1

operations-analytics · 203fc2a84965e1fca21825d669b27f920f4ff1a4434b1738146a107798d3a755

Authorship and review status are not recorded here.

Template tasks (54)

Review tasks and choose or change owners before creating your project. Assigning an agent does not start it.

Tasks begin as To Do in your project.

  • #1Data Quality & GovernanceHigh

    Address the accuracy, completeness, and stewardship of the data that every model and decision downstream depends on.

    Completion check

    The data quality & governance work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 0 days after project start · Planned duration: 14 days

  • #2Data Warehouse / Analytics InfrastructureMedium

    The warehouses, schemas, ETL, and operational systems (CMMS, WMS, EAM) that integrate and serve data for analysis.

    Completion check

    The data warehouse / analytics infrastructure work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 14 days after project start · Planned duration: 7 days

  • #3Inventory Levels & InvestmentMedium

    Use the vocabulary and levers for measuring how much stock you hold and the capital it consumes, broken into cycle, safety, WIP, and pipeline components.

    Completion check

    The inventory levels & investment work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 21 days after project start · Planned duration: 7 days

  • #4Supply Chain VisibilityMedium

    What near-real-time transparency and traceability across the end-to-end chain give you, and where the value of seeing actually comes from.

    Completion check

    The supply chain visibility work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 28 days after project start · Planned duration: 7 days

  • #5Performance Measurement & Metrics SystemHigh

    Designing balanced, strategy-aligned KPIs and scorecards that drive the right behavior instead of the metric's letter.

    Completion check

    The performance measurement & metrics system work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 35 days after project start · Planned duration: 14 days

  • #6Work Order System DisciplineMedium

    Establishes the work order system as the foundational record for every maintenance action. You learn to treat it as your primary data source, not administrative overhead.

    Completion check

    The work order system discipline work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 49 days after project start · Planned duration: 7 days

  • #7Labor Productivity / Wrench TimeMedium

    Define wrench time as the share of the day spent on direct value-adding work and shows how to raise it. You learn that the constraint is usually the system around the technician, not the technician.

    Completion check

    The labor productivity / wrench time work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 56 days after project start · Planned duration: 7 days

  • #8Worker / System Productivity OutputMedium

    Address productivity as output per unit of input — how effectively workers and the work system convert effort and resources into results.

    Completion check

    The worker / system productivity output work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 63 days after project start · Planned duration: 7 days

  • #9Quantitative Modeling & Analytics ApplicationHigh

    Where formal methods—optimization, simulation, statistics, machine learning—actually earn their keep in operations and how to sequence them against a real decision.

    Completion check

    The quantitative modeling & analytics application work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 70 days after project start · Planned duration: 14 days

  • #10Problem Formulation & Model FidelityHigh

    The translation step: turning a messy operational question into decision variables, an objective, and constraints that faithfully mirror the real system.

    Completion check

    The problem formulation & model fidelity work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 84 days after project start · Planned duration: 14 days

  • #11Resource & Problem ConstraintsMedium

    Inventory the real physical, financial, capacity, and lead-time limits that bound feasible operational action.

    Completion check

    The resource & problem constraints work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 98 days after project start · Planned duration: 7 days

  • #12Analytical Capability & InsightMedium

    Concerns your organization's capacity to interrogate data multidimensionally and understand why the numbers behave as they do.

    Completion check

    The analytical capability & insight work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 105 days after project start · Planned duration: 7 days

  • #13Demand Forecasting Process & AccuracyHigh

    The methods and discipline of demand forecasting and how to measure whether your process actually adds value.

    Completion check

    The demand forecasting process & accuracy work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 112 days after project start · Planned duration: 14 days

  • #14Demand & Process Variability / UncertaintyHigh

    The inherent dispersion in demand, lead times, and process timing that operations must absorb rather than eliminate.

    Completion check

    The demand & process variability / uncertainty work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 126 days after project start · Planned duration: 14 days

  • #15Inventory Policy & Safety StockHigh

    The replenishment decision rules—order quantity, reorder point, review period, safety stock—that balance service against cost under uncertainty.

    Completion check

    The inventory policy & safety stock work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 140 days after project start · Planned duration: 14 days

  • #16Service Level & Stockout RiskHigh

    Define how you quantify your ability to satisfy demand from stock — fill rate versus cycle service level — and how to price the cost of falling short.

    Completion check

    The service level & stockout risk work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 154 days after project start · Planned duration: 14 days

  • #17Production Planning & Scheduling SystemsMedium

    Maps the hierarchy of planning frameworks — from aggregate S&OP down to shop-floor scheduling and MRP/JIT logic — and how they reconcile supply with demand at different horizons.

    Completion check

    The production planning & scheduling systems work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 168 days after project start · Planned duration: 7 days

  • #18Lean / Waste EliminationHigh

    This core section covers the systematic removal of non-value-adding activity through lean principles — value stream mapping, flow, and pull — and how it produces process efficiency.

    Completion check

    The lean / waste elimination work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 175 days after project start · Planned duration: 14 days

  • #19Six Sigma / Process Variation ReductionMedium

    The DMAIC discipline for attacking process variation and defects when averages look fine but outcomes remain unreliable.

    Completion check

    The six sigma / process variation reduction work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 189 days after project start · Planned duration: 7 days

  • #20Queueing, Congestion & WIPMedium

    Why work piles up and waits even when you have 'enough' capacity, using the physics of utilization and variability.

    Completion check

    The queueing, congestion & wip work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 196 days after project start · Planned duration: 7 days

  • #21Throughput & Cycle TimeMedium

    Connect the rate of output to the time work spends in the system, and gives you Little's Law as the lever that ties them to WIP.

    Completion check

    The throughput & cycle time work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 203 days after project start · Planned duration: 7 days

  • #22Workforce Management, Training & SkillHigh

    How deliberate selection, training, and cross-training turn a headcount into a deployable, competent workforce. You learn to design work scientifically rather than staff reactively.

    Completion check

    The workforce management, training & skill work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 210 days after project start · Planned duration: 14 days

  • #23Preventive/Proactive Maintenance ProgramHigh

    The shift from reactive firefighting to planned, condition-based, and predictive maintenance. You learn how to move maintenance upstream of failure without over-maintaining.

    Completion check

    The preventive/proactive maintenance program work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 224 days after project start · Planned duration: 14 days

  • #24Maintenance Planning & Scheduling DisciplineHigh

    Separates planning (defining scope, parts, and procedures) from scheduling (fitting work to available capacity). You learn why the two are distinct disciplines and why both need dedicated ownership.

    Completion check

    The maintenance planning & scheduling discipline work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 238 days after project start · Planned duration: 14 days

  • #25Quality & Conformance PerformanceMedium

    Make conformance to specification a measured, repeatable outcome rather than an inspection afterthought.

    Completion check

    The quality & conformance performance work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 252 days after project start · Planned duration: 7 days

  • #26Validation Discipline & Overfitting ControlLow

    The rigor—out-of-sample testing, verification, validation—that ensures measured performance holds up on data you haven't seen.

    Completion check

    The validation discipline & overfitting control work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 259 days after project start · Planned duration: 3 days

  • #27Forecast Judgmental BiasLow

    Address how human adjustments to forecasts introduce systematic distortion, and how to detect and correct it.

    Completion check

    The forecast judgmental bias work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 262 days after project start · Planned duration: 3 days

  • #28Supply-Demand Match / AlignmentMedium

    The central operational goal — putting the right supply in the right place at the right time — and how forecasting quality flows into it.

    Completion check

    The supply-demand match / alignment work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 265 days after project start · Planned duration: 7 days

  • #29Supply Chain Coordination & IntegrationHigh

    This core section shows how aligning decisions and sharing information across functions and firms lets the chain optimize globally, and how that dampens bullwhip and lifts overall performance.

    Completion check

    The supply chain coordination & integration work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 272 days after project start · Planned duration: 14 days

  • #30Bullwhip / Demand AmplificationLow

    Why order variability grows as it moves upstream, the four structural causes, and why coordination moderates it.

    Completion check

    The bullwhip / demand amplification work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 286 days after project start · Planned duration: 3 days

  • #31Network, Facility & Transportation DesignMedium

    The strategic, long-horizon decisions — where facilities sit, what role they play, how much capacity, which transport modes and routes — that set the physical shape of the chain.

    Completion check

    The network, facility & transportation design work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 289 days after project start · Planned duration: 7 days

  • #32Supply Chain SegmentationLow

    Divide customers, products, and suppliers into groups with common needs so each gets a strategy tuned to it rather than a one-size-fits-all supply chain.

    Completion check

    The supply chain segmentation work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 296 days after project start · Planned duration: 3 days

  • #33Sourcing & Supplier ManagementMedium

    The make-versus-buy decision, supplier selection, contract design, and the ongoing measurement of supplier performance.

    Completion check

    The sourcing & supplier management work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 299 days after project start · Planned duration: 7 days

  • #34Continuous Improvement & Organizational LearningHigh

    Convert one-off fixes into a durable improvement engine — the kaizen, benchmarking, and learning loops that compound gains rather than let them decay.

    Completion check

    The continuous improvement & organizational learning work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 306 days after project start · Planned duration: 14 days

  • #35Buffering (Inventory/Capacity/Time)Low

    Inventory, capacity, and time as three interchangeable buffers you deploy against variability — and the flexibility to shift between them.

    Completion check

    The buffering (inventory/capacity/time) work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 320 days after project start · Planned duration: 3 days

  • #36Process & Operational EfficiencyHigh

    Define what productive output per input actually means in operations and how upstream levers — lean, resource allocation, learning — converge to produce it.

    Completion check

    The process & operational efficiency work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 323 days after project start · Planned duration: 14 days

  • #37Resource Allocation EfficiencyHigh

    Address how to assign scarce capital, labor, materials, and time across competing demands so the system, not any single project, comes out ahead.

    Completion check

    The resource allocation efficiency work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 337 days after project start · Planned duration: 14 days

  • #38Decision-Making Quality & RigorHigh

    Focus on about upgrading decisions from intuition to systematic, evidence-based analysis, and knowing when the upgrade is worth its cost.

    Completion check

    The decision-making quality & rigor work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 351 days after project start · Planned duration: 14 days

  • #39Aligned IncentivesLow

    Address whether your rewards and metrics make people act in the whole system's interest or in narrow local ones.

    Completion check

    The aligned incentives work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 365 days after project start · Planned duration: 3 days

  • #40Experimentation & IterationLow

    Running disciplined build-measure-learn experiments with real hypotheses and predefined success criteria before you scale a change.

    Completion check

    The experimentation & iteration work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 368 days after project start · Planned duration: 3 days

  • #41Employee Engagement, Ownership & MoraleHigh

    Create the psychological conditions under which frontline people take responsibility for outcomes. You learn what actually generates ownership versus what merely simulates it.

    Completion check

    The employee engagement, ownership & morale work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 371 days after project start · Planned duration: 14 days

  • #42Human Error, Safety & Fatigue ManagementLow

    Reframes safety and reliability around latent conditions and error-provoking systems rather than individual carelessness. You learn to build defenses that catch the errors people will inevitably make.

    Completion check

    The human error, safety & fatigue management work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 385 days after project start · Planned duration: 3 days

  • #43Asset Availability, Reliability & OEEHigh

    Uptime, reliability (MTBF), performance, and their composite in OEE. You learn to read OEE as a diagnostic that decomposes losses, not as a single scorecard number.

    Completion check

    The asset availability, reliability & oee work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 388 days after project start · Planned duration: 14 days

  • #44Cost Reduction & Cost-EffectivenessHigh

    Reducing total operating, logistics, and maintenance cost — including the cost of poor quality — through efficiency rather than cuts. You learn to distinguish waste elimination from cost shifting.

    Completion check

    The cost reduction & cost-effectiveness work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 402 days after project start · Planned duration: 14 days

  • #45Customer Service & SatisfactionHigh

    Connect operational levers — order speed, accuracy, availability — to the satisfaction and perceived value customers actually experience.

    Completion check

    The customer service & satisfaction work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 416 days after project start · Planned duration: 14 days

  • #46Supply Chain / Operational PerformanceHigh

    Operational performance as a multi-dimensional composite — cost, quality, speed, dependability, flexibility, service — that you must manage as a portfolio of trade-offs.

    Completion check

    The supply chain / operational performance work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 430 days after project start · Planned duration: 14 days

  • #47Strategic Alignment of OperationsHigh

    Connect your operational metrics and priorities back to the competitive strategy they are supposed to serve.

    Completion check

    The strategic alignment of operations work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 444 days after project start · Planned duration: 14 days

  • #48Supply Chain Risk Management & ResilienceMedium

    Distinguishes risk management (identifying and mitigating known exposures) from resilience (recovering from what you didn't foresee), and how to build both.

    Completion check

    The supply chain risk management & resilience work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 458 days after project start · Planned duration: 7 days

  • #49Data-Driven Culture, Sponsorship & Change ManagementHigh

    The executive commitment and cultural norms that determine whether analytics and improvement programs take root or get politely ignored.

    Completion check

    The data-driven culture, sponsorship & change management work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 465 days after project start · Planned duration: 14 days

  • #50Customer Engagement, Retention & Growth MetricsLow

    Read the metrics that reveal whether your product-market fit is real and whether growth compounds or leaks. You learn which numbers to trust and how they interlock.

    Completion check

    The customer engagement, retention & growth metrics work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 479 days after project start · Planned duration: 3 days

  • #51Leadership, Coaching & Hoshin AlignmentLow

    The leader behaviors that develop people and align the organization through catch-ball and hoshin. You learn to lead by developing problem-solvers rather than solving problems yourself.

    Completion check

    The leadership, coaching & hoshin alignment work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 482 days after project start · Planned duration: 3 days

  • #52Organizational Agility & ResponsivenessHigh

    The capability to absorb demand shifts and disruptions without breaking service. You learn what structural choices make responsiveness possible before the shock arrives.

    Completion check

    The organizational agility & responsiveness work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 485 days after project start · Planned duration: 14 days

  • #53Firm Profitability & Financial OutcomeHigh

    Links operational levers — asset reliability, cost, service — to the financial statements where operations ultimately either create or destroy value.

    Completion check

    The firm profitability & financial outcome work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 499 days after project start · Planned duration: 14 days

  • #54Competitive Advantage & SustainabilityHigh

    Operational and financial results convert into durable advantage — the ability to keep outperforming rivals and remain viable over the long term.

    Completion check

    The competitive advantage & sustainability work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 513 days after project start · Planned duration: 14 days

Start this plan

Sign in to review and change this plan before creating a private project.

Template usage
  • Recorded uses: 0
  • Projects marked complete: 0 (self-declared)
  • Independent completion results are not available.