Find The One Constraint Holding Back Performance

Start this plan

The rate at which the system generates money through sales, together with lead-time, cycle-time, due-date reliability, and inventory outcomes attributable to constraint management. (Dissolve conflicts, move the constraint to the market, sustain the climb.)

started 0 · finished 0 (claimed) · not yet measured (verified) · no data (n<5)

Derived from: Find The One Constraint Holding Back PerformanceT1

Ordered tasks (25) — this is what a project auto-creates

  • #1Cost-World / Local Optimization ParadigmMediumTo Do

    Names the underlying belief system—that optimizing every part optimizes the whole—so you can recognize and dismantle it where it lurks.

    Assignee: Unassigned · due 0 days after project start · takes 7 days

  • #2Shared System UnderstandingMediumTo Do

    Building a shared, cause-effect grasp of the system goal and how root causes drive the visible problems—across all the stakeholders who must act.

    Assignee: Unassigned · due 7 days after project start · takes 7 days

  • #3Systemic Goal Clarity & AgreementMediumTo Do

    Define and communicate a single system-level goal so that improvement efforts pull in one direction rather than optimizing fragments.

    Assignee: Unassigned · due 14 days after project start · takes 7 days

  • #4Uncertainty & VariationMediumTo Do

    The variability — in demand, timing, and process outcomes — that makes exact optimization impossible and dictates where buffers belong.

    Assignee: Unassigned · due 21 days after project start · takes 7 days

  • #5Constraint IdentificationHighTo Do

    Locate the single resource, policy, or core problem that actually caps throughput—and how to rule out the impostors that merely look busy.

    Assignee: Unassigned · due 28 days after project start · takes 14 days

  • #6Constraint ExploitationHighTo Do

    Wring maximum throughput from the constraint you already own—before spending anything to add capacity.

    Assignee: Unassigned · due 42 days after project start · takes 14 days

  • #7Subordination of Non-ConstraintsHighTo Do

    Make every non-constraint resource serve the constraint's pace and needs instead of chasing its own efficiency numbers.

    Assignee: Unassigned · due 56 days after project start · takes 14 days

  • #8Throughput / Global Measurement SystemHighTo Do

    Replaces cost-per-unit and local-efficiency scorekeeping with three global measures—Throughput, Inventory/Investment, Operating Expense—as the basis for decisions.

    Assignee: Unassigned · due 70 days after project start · takes 14 days

  • #9Application of TOC / Five Focusing StepsHighTo Do

    Use the disciplined five-step loop (identify, exploit, subordinate, elevate, repeat) that turns 'manage by the constraint' from a slogan into a repeatable operating rhythm.

    Assignee: Unassigned · due 84 days after project start · takes 14 days

  • #10System Flow Synchronization / Flow ControlMediumTo Do

    Use the mechanisms—drum-buffer-rope, buffer management, pull—that pace the whole system to the constraint and keep flow smooth and predictable.

    Assignee: Unassigned · due 98 days after project start · takes 7 days

  • #11Reduced Bad Multitasking / FirefightingMediumTo Do

    Address the behavioral shift from switching among many open tasks to finishing each one relay-runner style, and why that alone shortens lead times.

    Assignee: Unassigned · due 105 days after project start · takes 7 days

  • #12Protective / Excess CapacityLowTo Do

    Why you deliberately keep some non-constraint capacity unused, and how much protection the constraint actually needs.

    Assignee: Unassigned · due 112 days after project start · takes 3 days

  • #13Throughput & Operational PerformanceHighTo Do

    Define the operational scoreboard for constraint management — the rate of generating money through sales alongside lead time, reliability, and inventory.

    Assignee: Unassigned · due 115 days after project start · takes 14 days

  • #14TOC Thinking Processes / Logical AnalysisHighTo Do

    Introduces Goldratt's logical toolset—Evaporating Cloud, Reality Trees, Prerequisite Tree, and the Categories of Legitimate Reservation—for finding root causes and building solutions that hold up.

    Assignee: Unassigned · due 129 days after project start · takes 14 days

  • #15Assumption Surfacing & Conflict ResolutionMediumTo Do

    Make hidden assumptions explicit and dissolve core dilemmas without compromise, producing solutions both sides genuinely accept.

    Assignee: Unassigned · due 143 days after project start · takes 7 days

  • #16Solution Robustness & Proactive PlanningMediumTo Do

    Stress-testing a proposed solution logically, trimming its negative side effects, and mapping obstacles and milestones before you execute.

    Assignee: Unassigned · due 150 days after project start · takes 7 days

  • #17Stakeholder Buy-In & Resistance ManagementHighTo Do

    Move the people affected by a constraint fix from grudging tolerance to active ownership, working through the predictable layers of resistance one at a time.

    Assignee: Unassigned · due 157 days after project start · takes 14 days

  • #18Leadership Commitment & Governance StructureMediumTo Do

    What leaders must actually do — beyond endorsement — to make constraint-based management stick, and how governance and rewards either reinforce or quietly sabotage it.

    Assignee: Unassigned · due 171 days after project start · takes 7 days

  • #19Cooperative Culture & MotivationMediumTo Do

    Address the trust and cross-unit cooperation required for one part of the system to willingly deprioritize its own output for the sake of the constraint.

    Assignee: Unassigned · due 178 days after project start · takes 7 days

  • #20Managerial PredictabilityLowTo Do

    Define predictability as the core management capability — anticipating how events will unfold — and shows how constraint focus makes a system predictable enough to manage.

    Assignee: Unassigned · due 185 days after project start · takes 3 days

  • #21Realignment of Rules & HabitsLowTo Do

    The rules and habits that were built to cope with an old limitation and must be dismantled once that limitation is broken — the step most improvements forget.

    Assignee: Unassigned · due 188 days after project start · takes 3 days

  • #22Irresistible Market Offer & SegmentationMediumTo Do

    Convert constraint-driven operational strength into a market offer so compelling that competitors cannot copy it, and how segmentation multiplies its reach.

    Assignee: Unassigned · due 191 days after project start · takes 7 days

  • #23Financial Performance & Profitable GrowthHighTo Do

    Connect operational throughput to the ultimate financial results — profit, ROI, cash, and the profitable growth that secures the enterprise and its jobs.

    Assignee: Unassigned · due 198 days after project start · takes 14 days

  • #24Sustainable Competitive AdvantageMediumTo Do

    How constraint-driven performance becomes a durable, hard-to-copy market edge rather than a fleeting improvement.

    Assignee: Unassigned · due 212 days after project start · takes 7 days

  • #25Sustained Continuous Improvement (POOGI)HighTo Do

    Convert a one-time constraint fix into a repeating cycle that keeps finding the next binding limit as your system grows. You get the mechanics of turning improvement into a permanent organizational rhythm rather than a project.

    Assignee: Unassigned · due 219 days after project start · takes 14 days