← Templates

Design Surveys People Answer Honestly

5 tasks

Firm- or unit-level effectiveness, financial results, productivity, and sustainable competitive advantage—the ultimate organizational outcome. (Cumulating knowledge and setting the standards of rigor.)

Start this plan

Sign in to review and change this plan before creating a private project.

Derived from guideDesign Surveys People Answer Honestly
Source details

Derivation tier: T1

survey-and-instrument-design · ae2d1647801d1bf336adde45db2b822c52e987a4418dad1f54bdcd9a1e9645ac

Authorship and review status are not recorded here.

Template tasks (5)

Review tasks and choose or change owners before creating your project. Assigning an agent does not start it.

Tasks begin as To Do in your project.

  • #1Survey Response and Cognitive ProcessLow

    Unpacks the four-stage cognitive process—comprehend, retrieve, judge, report—that respondents run through, and how each stage silently shapes the accuracy of your data.

    Completion check

    The survey response and cognitive process work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 0 days after project start · Planned duration: 3 days

  • #2Question and Instrument DesignMedium

    The controllable choices—wording, response format, item order, structure—that you decide when building an instrument, and how they produce or destroy measurement validity.

    Completion check

    The question and instrument design work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 3 days after project start · Planned duration: 7 days

  • #3Measurement ValidityHigh

    Establish that your measure actually captures the concept you claim to study, not something adjacent to it. You get the three evidentiary lines — content, criterion, construct — and how to assemble them.

    Completion check

    The measurement validity work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 10 days after project start · Planned duration: 14 days

  • #4Measurement ReliabilityHigh

    Quantify and improve the consistency of your measurements, distinguishing true-score signal from random error. You learn which reliability coefficient fits which measurement situation.

    Completion check

    The measurement reliability work is complete: key decisions are recorded and outputs are ready for the next phase.

    Choose or change the owner during setup.

    Starts 24 days after project start · Planned duration: 14 days

  • #5Pilot the instrument and revise items that fail comprehension or produce missing dataHigh

    Field a small-sample pilot through the comprehend-retrieve-judge-report sequence and rewrite items that respondents cannot answer accurately.

    Completion check

    The instrument pilot work is complete: revised items and a record of what failed are ready for the next phase.

    Choose or change the owner during setup.

    Starts 38 days after project start · Planned duration: 7 days

Start this plan

Sign in to review and change this plan before creating a private project.

Template usage
  • Recorded uses: 0
  • Projects marked complete: 0 (self-declared)
  • Independent completion results are not available.