Build AI Systems That Ship
49 tasks
The overall fitness of model outputs — factual correctness, relevance, coherence, format compliance — for the user's need; the central mediator between design levers and outcomes. (Compounding value, trust, and safety at scale.)
Sign in to review and change this plan before creating a private project.
Source details
Derivation tier: T1
ai-engineering · 7740dcbaecacf2849d476e3e9805c5e329215598221abd57dd081fef65fcb8c4
Authorship and review status are not recorded here.
Template tasks (49)
Review tasks and choose or change owners before creating your project. Assigning an agent does not start it.
Tasks begin as To Do in your project.
- #1Prompt Engineering QualityHigh
Shape model behavior through the input itself — roles, instructions, examples, and decoding — before you reach for weights or retrieval.
Completion check
The prompt engineering quality work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 0 days after project start · Planned duration: 14 days
- #2Model & Architecture SelectionHigh
Choose the model family, scale, and provider that set the hard ceiling on capability, latency, and cost before any tuning begins.
Completion check
The model & architecture selection work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 14 days after project start · Planned duration: 14 days
- #3Model Output Quality & AccuracyHigh
Define how you measure the thing everything else feeds into — the actual quality of predictions and generations on held-out and live inputs.
Completion check
The model output quality & accuracy work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 28 days after project start · Planned duration: 14 days
- #4Problem Framing & Business AlignmentMedium
Focus on about converting a fuzzy business ask into a measurable ML task worth building. It gives you the framing decisions that determine whether any downstream engineering matters.
Completion check
The problem framing & business alignment work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 42 days after project start · Planned duration: 7 days
- #5Compute & Hardware ResourcesMedium
Focus on about how hardware availability constrains what you can train and serve, and how it interacts with inference optimization. It helps you plan around compute as a hard boundary, not an afterthought.
Completion check
The compute & hardware resources work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 49 days after project start · Planned duration: 7 days
- #6Retrieval-Augmented Generation & Context ConstructionHigh
Feed the model current, domain-specific facts at inference time so its answers rest on retrieved evidence rather than stale training memory.
Completion check
The retrieval-augmented generation & context construction work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 56 days after project start · Planned duration: 14 days
- #7Context Grounding & Knowledge AccessHigh
Focus on about whether the model actually uses the context you gave it, versus overriding it with confident parametric guesses.
Completion check
The context grounding & knowledge access work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 70 days after project start · Planned duration: 14 days
- #8Finetuning & Domain SpecializationHigh
When adapting the model's weights beats prompting or retrieval, and how to do it without destroying general capability.
Completion check
The finetuning & domain specialization work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 84 days after project start · Planned duration: 14 days
- #9Training Data Quality, Coverage & VolumeHigh
Address the cleanliness, coverage, volume, and predictive power of your training data. You learn why data work, not model work, drives most quality gains.
Completion check
The training data quality, coverage & volume work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 98 days after project start · Planned duration: 14 days
- #10Feature Engineering QualityHigh
Turning raw data into informative, reliable features — still decisive for tabular and classical ML systems that ship alongside LLM components.
Completion check
The feature engineering quality work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 112 days after project start · Planned duration: 14 days
- #11Data Engineering & ManagementHigh
Address the plumbing — sourcing, labeling, validating, versioning, and governing the data that feeds every model you train or evaluate.
Completion check
The data engineering & management work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 126 days after project start · Planned duration: 14 days
- #12Model Capacity & ComplexityHigh
How a model family's expressive power interacts with your data volume to determine whether you underfit, overfit, or generalize.
Completion check
The model capacity & complexity work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 140 days after project start · Planned duration: 14 days
- #13Regularization & Overfitting ControlHigh
How regularization constrains model complexity to control variance. You learn to read the symptoms that tell you which direction to move.
Completion check
The regularization & overfitting control work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 154 days after project start · Planned duration: 14 days
- #14Training & Optimization DynamicsHigh
The mechanics of getting training to converge — loss design, initialization, normalization, learning rate, and gradient stability.
Completion check
The training & optimization dynamics work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 168 days after project start · Planned duration: 14 days
- #15Hyperparameter Tuning & Model SelectionHigh
The disciplined search over non-learned settings — regularization strength, learning rate, decoding params — that selects the best-generalizing configuration.
Completion check
The hyperparameter tuning & model selection work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 182 days after project start · Planned duration: 14 days
- #16Generalization PerformanceHigh
The central objective — performance on unseen data — and the four levers (data, capacity, regularization, tuning) that move it.
Completion check
The generalization performance work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 196 days after project start · Planned duration: 14 days
- #17Hallucination Reduction & Factual ConsistencyHigh
Address keeping outputs faithful to source facts — minimizing confident fabrication that survives review because it reads as fluent.
Completion check
The hallucination reduction & factual consistency work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 210 days after project start · Planned duration: 14 days
- #18Generative Model Quality & DiversityHigh
Separates the two failure modes of generative systems — unrealistic outputs and collapsed diversity — and shows why you must measure both before shipping.
Completion check
The generative model quality & diversity work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 224 days after project start · Planned duration: 14 days
- #19Uncertainty QuantificationMedium
Make your model report how confident it should be, separating irreducible noise from things it simply hasn't learned.
Completion check
The uncertainty quantification work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 238 days after project start · Planned duration: 7 days
- #20Agent & Multi-Agent Architecture DesignHigh
Decide between a single agent and a coordinated multi-agent system, and how to structure the orchestration loop that drives planning and tool use.
Completion check
The agent & multi-agent architecture design work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 245 days after project start · Planned duration: 14 days
- #21Tool Integration & Action SpaceHigh
Define, describe, and expose tools so an agent can reliably choose and invoke them, including interoperability protocols like MCP and A2A.
Completion check
The tool integration & action space work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 259 days after project start · Planned duration: 14 days
- #22Agent Reasoning & Planning CapabilityHigh
Elicit and structure reliable goal decomposition, multi-step planning, and coherent tool selection from an agent.
Completion check
The agent reasoning & planning capability work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 273 days after project start · Planned duration: 14 days
- #23Agent Memory & StateHigh
Retain conversational context within a session and persist knowledge across sessions so the agent acts on what it already knows.
Completion check
The agent memory & state work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 287 days after project start · Planned duration: 14 days
- #24Agent Reflection, Error Recovery & LearningHigh
Give an agent the ability to check its own progress, recover from failures mid-task, and improve from feedback over time.
Completion check
The agent reflection, error recovery & learning work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 301 days after project start · Planned duration: 14 days
- #25Agent Autonomy & Action SafetyHigh
Calibrate how much independent action an agent takes against the guardrails, approval gates, and failure modes that keep it safe.
Completion check
The agent autonomy & action safety work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 315 days after project start · Planned duration: 14 days
- #26Task / Problem-Solving PerformanceHigh
Define how to measure whether your agent actually completes complex, multi-step tasks — success, accuracy, and efficiency end-to-end.
Completion check
The task / problem-solving performance work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 329 days after project start · Planned duration: 14 days
- #27Deployment & Serving ArchitectureHigh
Choosing deployment patterns and serving frameworks — online vs. batch, edge vs. cloud, containers vs. serverless — that meet your latency and cost constraints.
Completion check
The deployment & serving architecture work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 343 days after project start · Planned duration: 14 days
- #28Inference Optimization & EfficiencyHigh
The model- and system-level techniques — quantization, compression, batching — that cut latency and compute cost enough to make production viable.
Completion check
The inference optimization & efficiency work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 357 days after project start · Planned duration: 14 days
- #29Cost & Resource EfficiencyHigh
Understanding and controlling the real operating cost of your system — tokens, API spend, and deployment compute — and designing to minimize waste.
Completion check
The cost & resource efficiency work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 371 days after project start · Planned duration: 14 days
- #30Monitoring & ObservabilityHigh
Instrument production AI with tracing, logging, and alerting on the signals — drift, quality, cost — that reveal system health and degradation.
Completion check
The monitoring & observability work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 385 days after project start · Planned duration: 14 days
- #31Evaluation & Validation RigorHigh
Build an evaluation pipeline you can trust to make ship/no-ship decisions, and to power fast iteration.
Completion check
The evaluation & validation rigor work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 399 days after project start · Planned duration: 14 days
- #32MLOps Infrastructure & Pipeline AutomationMedium
Use the plumbing that turns ad-hoc model experiments into a repeatable delivery pipeline. You will learn what to standardize first and what to defer.
Completion check
The mlops infrastructure & pipeline automation work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 413 days after project start · Planned duration: 7 days
- #33System Reliability & RobustnessHigh
Make production behavior consistent, robust, and repairable under real traffic, drift, and failure. You get the operational levers that keep a shipped AI system running rather than the model metrics that got it deployed.
Completion check
The system reliability & robustness work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 420 days after project start · Planned duration: 14 days
- #34System ScalabilityMedium
Keep cost and latency flat as traffic, data, and the number of deployed models grow. It focuses on the scaling axis most teams ignore: model count.
Completion check
The system scalability work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 434 days after project start · Planned duration: 7 days
- #35Maintainability & ReproducibilityMedium
Focus on about whether an engineer who didn't build the system can debug, reproduce, and safely change it a year later. It treats maintainability as a first-class deliverable, not documentation hygiene.
Completion check
The maintainability & reproducibility work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 441 days after project start · Planned duration: 7 days
- #36Explainability & TransparencyMedium
Making model and agent decisions inspectable to the humans who must trust, debug, or contest them. It distinguishes explanations that aid engineers from those that aid users and regulators.
Completion check
The explainability & transparency work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 448 days after project start · Planned duration: 7 days
- #37Developer Productivity & VelocityMedium
Focus on about the speed and friction of your build-iterate-ship loop — the tooling and feedback latency that governs how fast the team moves.
Completion check
The developer productivity & velocity work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 455 days after project start · Planned duration: 7 days
- #38Continual Learning & Data FlywheelHigh
Building the feedback loops and infrastructure for safe, frequent model updates driven by new data, drift, and user feedback — the data flywheel.
Completion check
The continual learning & data flywheel work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 462 days after project start · Planned duration: 14 days
- #39Data Distribution Shift & DriftMedium
Focus on about detecting when production data drifts from what the model learned, and keeping the model fresh enough to keep working.
Completion check
The data distribution shift & drift work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 476 days after project start · Planned duration: 7 days
- #40Security, Guardrails & Safety ControlsHigh
Define the layered defenses an LLM or agent system needs against misuse, injection, and leakage. It gives you the ordering of controls and where single layers fail.
Completion check
The security, guardrails & safety controls work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 483 days after project start · Planned duration: 14 days
- #41Responsible AI, Fairness & EthicsHigh
Building fairness, privacy, and harm mitigation into design and deployment rather than auditing for them afterward. You get the practices that make the system defensible to users and regulators.
Completion check
The responsible ai, fairness & ethics work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 497 days after project start · Planned duration: 14 days
- #42Developer Vigilance & Verification DisciplineLow
Address the human rigor required when AI generates your code and artifacts. It is about resisting the pull to accept plausible output without verification.
Completion check
The developer vigilance & verification discipline work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 511 days after project start · Planned duration: 3 days
- #43Team, Organization & Change ManagementMedium
The people and process changes that let AI systems actually get adopted and maintained. It treats reliability as partly an organizational property, not just a technical one.
Completion check
The team, organization & change management work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 514 days after project start · Planned duration: 7 days
- #44User Trust, Adoption & SatisfactionHigh
Focus on about why users continue (or abandon) using your system, and how trust converts to business value. It links output quality, reliability, and fairness to the human decision to rely on the system.
Completion check
The user trust, adoption & satisfaction work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 521 days after project start · Planned duration: 14 days
- #45Business Value & ImpactHigh
Define the outcome the whole system exists to produce: real-world impact and user task success. You get how to measure value in terms of decisions changed and tasks completed, not model metrics.
Completion check
The business value & impact work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 535 days after project start · Planned duration: 14 days
- #46Human-Centered & Collaboration DesignMedium
Designing the human-AI interaction — autonomy levels, interfaces, handoffs — so the system augments people. It focuses on the collaboration surface, not the model itself.
Completion check
The human-centered & collaboration design work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 549 days after project start · Planned duration: 7 days
- #47AI Ecosystem & Power DynamicsLow
Situates your system within the macro forces — vendor competition, compute concentration, geopolitics — that shape what you can build and depend on. It is about strategic exposure, not code.
Completion check
The ai ecosystem & power dynamics work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 556 days after project start · Planned duration: 3 days
- #48Existential Safety & Value AlignmentHigh
Apply a working stance on building AI whose objectives stay corrigible and deferential even as capability grows, framed for systems you actually ship rather than hypothetical superintelligence.
Completion check
The existential safety & value alignment work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 559 days after project start · Planned duration: 14 days
- #49Scaling Laws & Network StructureHigh
The power-law relationships that let you predict how model performance and cost move as you grow parameters, data, and compute — and when growth stops paying off.
Completion check
The scaling laws & network structure work is complete: key decisions are recorded and outputs are ready for the next phase.
Choose or change the owner during setup.
Starts 573 days after project start · Planned duration: 14 days
Sign in to review and change this plan before creating a private project.